Workshop
 

 

 

This section is obsolete. It was setup in NOV 2005 in order to inform donors/contributors of the specific tasks being developed, on a transparency optics/politics. Last official donation has been in JAN 2006.

Please remark the financial status in DEC 2005, stated at the bottom of the page. That was the grand total I mean THE grand total in my TOTAL pockets

Following is the last update

--------------------------------------------------------------------------------

 

 

Workshop states short/mid term objectives in a Gantt chart, queued tasks, completed task, budget management

  • Information may be given in a generic way if related intellectual property is sensitive
  • : You can choose to finance specific queued tasks, in conjunction with the shares & contribution strategy
  • a Work in Progress diary is the end-recipient of completed tasks


 

Queued tasks

Task #
Gantt task REF
short description
queued

start

finish (est)
sponsored by
% complete
090206 n/a XVST 090206 250206 310506   0
 

XVST is a visual sensorial transposition kit, a "plug in" for R/C models

   
Task #
Gantt task REF
short description
queued

start

finish (est)
sponsored by
% complete
231105 n/a C8.03 legacy 231105 231105 n/a   0
 

Creature 8 Prototype 03 follows the prototyping thread of a 5-line kite for aerial choreographies. Holds same solid volume of 02 and wings, but it is entirely done in composite(epoxy-special tissue). C8.03 demonstrates a whole manufacturing cycle: design, plug construction, molds, composite layout& vacuum bagging, assembly, test flying. Budget worth 40 euros, including epoxy resin and special tissue. Materials were acquired in the past

   
 
   
Completed task
Task #
Gantt task REF
short description
queued

start

finish (est)
sponsored by
% complete
281205 n/a Article02 281205 281205

300106

  100@020206
 

Article 03 features Article 01 mock up (the GoldBird) linked to 17 Articles 02. It has been sold as artwork according to the financial asset guideline established in NOV 2005: finance main R&D activities by selling Articles

Task #
Gantt task REF
short description
queued

start

finish (est)
sponsored by
% complete
281205 n/a Article02 281205 281205

300106

  100@020206
 

Article 02 full legacy: prototype, serial production, commercial distribution

Article 02 is the first Article being produced and sold by Aerial Creatures & Cognitive Integration, according to the financial asset guideline established in NOV 2005: finance main R&D activities by selling Articles

 

Task #
Gantt task REF
short description
queued

start

finish (est)
sponsored by
% complete
061105 n/a vacuum bagging pump & system 061105 061105

211105

  100@ DEC2005
 

Manufacture/assembly of a system for vacuum bagging small volumes (max 50 lts):

  • vacuum pump
  • valves
  • drainer
  • vacuum meter
  • suction cups

Vacuum bagging is a technique used for molding glass/carbon fiber + resin on a mold

I've tried already to use a very old cilinder+piston system attached to a band saw but it proved incapable of achieving less than approx 0.7 Bar. I plan to use a second hand refrigerator vacuum pump and other second hand items. The budget needed is about 20 euros.

 

Task #
Gantt task REF
short description
queued

start

finish (est)
sponsored by
% complete
071105 n/a C8 P02 rigging and test flying 071105 071105 181105   100@181105
 

Creature 8 Prototype 02 holds same planform of Prototype 01, but it's got a solid volume in polystyrene foam and some other peculiar structural/control issues. Overall budget is 20 euros

   
Short/Mid term objectives Gantt chart
 

 

 

Updated Gantt chart coherent with the new asset will be posted soon

Following is the obsolete Gantt for Project Masterblaster, Phase #2 (XMB). It was planned to be carried on in a professional way, and proved not possible

 

Budget management

Note: Budget is outdated to 24 Nov 2005. Detailed budget for Dec 2005 will be posted soon. Grand total at 31-12-2005 is simply zero net

 

date
description
in

out

06/11/05 overall grand total of money left in my pockets
30 E
13/11/05 2 days work as a waiter in a restaurant
40 E
 23/11/05  2 days work as a waiter in a restaurant (paid three days late because there was no money)
40 E
 22/11/05  vacuum system gasket, PVC cylinder and fittings
15E
   
   
   
   
   
--------------------------
--------------------------
24/11/05 Total
110 E
15 E