This section is obsolete.
It was setup in NOV 2005 in order to inform donors/contributors
of the specific tasks being developed, on a transparency optics/politics.
Last official donation has been in JAN 2006.
Please remark the financial
status in DEC 2005, stated at the bottom of the page. That was
the grand total I mean THE grand total in my TOTAL pockets
Following is the last update
-------------------------------------------------------------------------------- |
| |
Workshop states
short/mid term objectives in a Gantt chart,
queued tasks, completed
task, budget management
- Information
may be given in a generic way if related intellectual property
is sensitive
-
:
You can choose to finance specific queued tasks, in conjunction
with the shares &
contribution strategy
- a Work
in Progress diary is the end-recipient of completed tasks
|
|
Task
# |
Gantt
task REF |
short
description |
queued |
start |
finish
(est) |
sponsored
by |
%
complete |
| 090206 |
n/a |
XVST |
090206 |
250206 |
310506 |
 |
0 |
|
| |
XVST
is a visual sensorial transposition kit, a "plug in"
for R/C models |
| |
|
Task
# |
Gantt
task REF |
short
description |
queued |
start |
finish
(est) |
sponsored
by |
%
complete |
| 231105 |
n/a |
C8.03 legacy |
231105 |
231105 |
n/a |
 |
0 |
|
| |
Creature
8 Prototype 03 follows the prototyping thread of a 5-line kite
for aerial choreographies. Holds same solid volume of 02
and wings, but it is entirely done in composite(epoxy-special
tissue). C8.03 demonstrates a whole manufacturing cycle: design,
plug construction, molds, composite layout& vacuum bagging,
assembly, test flying. Budget worth 40 euros, including epoxy
resin and special tissue. Materials were acquired in the past |
| |
|
|
|
| |
|
|
Task
# |
Gantt
task REF |
short
description |
queued |
start |
finish
(est) |
sponsored
by |
%
complete |
| 281205 |
n/a |
Article02 |
281205 |
281205 |
300106 |
 |
100@020206 |
|
| |
Article
03 features Article
01 mock up (the GoldBird) linked to 17 Articles
02. It has been sold as artwork according to the financial
asset guideline established in NOV 2005:
finance main R&D activities by selling Articles |
Task
# |
Gantt
task REF |
short
description |
queued |
start |
finish
(est) |
sponsored
by |
%
complete |
| 281205 |
n/a |
Article02 |
281205 |
281205 |
300106 |
 |
100@020206 |
|
| |
Article
02 full legacy: prototype, serial production, commercial distribution
Article 02
is the first Article being produced and sold by Aerial Creatures
& Cognitive Integration, according to the financial
asset guideline established in NOV 2005: finance main R&D
activities by selling Articles
|
Task
# |
Gantt
task REF |
short
description |
queued |
start |
finish
(est) |
sponsored
by |
%
complete |
| 061105 |
n/a |
vacuum bagging pump
& system |
061105 |
061105 |
211105 |
 |
100@ DEC2005 |
|
| |
Manufacture/assembly
of a system for vacuum bagging small
volumes (max 50 lts):
- vacuum pump
- valves
- drainer
- vacuum meter
- suction
cups
Vacuum bagging is a technique
used for molding glass/carbon fiber + resin on a mold
I've tried already to use
a very old cilinder+piston system
attached to a band saw but it proved incapable of achieving less
than approx 0.7 Bar. I plan to use a second hand refrigerator
vacuum pump and other second hand items. The budget needed is
about 20 euros.
|
Task
# |
Gantt
task REF |
short
description |
queued |
start |
finish
(est) |
sponsored
by |
%
complete |
| 071105 |
n/a |
C8 P02 rigging and
test flying |
071105 |
071105 |
181105 |
 |
100@181105 |
|
| |
Creature
8 Prototype 02 holds same planform
of Prototype 01, but it's got a solid
volume in polystyrene foam and some other peculiar structural/control
issues. Overall budget is 20 euros |
| |
|
|
Short/Mid
term objectives Gantt chart |
| |
|
| |
Updated
Gantt chart coherent with the new asset
will be posted soon
Following is the obsolete
Gantt for Project Masterblaster, Phase #2
(XMB). It was planned to be carried on in a professional way,
and proved not possible

|
| |
|
Budget
management
Note: Budget is outdated
to 24 Nov 2005. Detailed budget for Dec 2005 will be posted
soon. Grand total at 31-12-2005 is simply zero net
|
| date |
description |
in |
out |
| 06/11/05 |
overall grand
total of money left in my pockets |
30
E |
|
| 13/11/05 |
2 days work as a
waiter in a restaurant |
40
E |
|
| 23/11/05 |
2 days work
as a waiter in a restaurant (paid three days late because
there was no money) |
40
E |
|
| 22/11/05 |
vacuum system
gasket, PVC cylinder and fittings |
|
15E |
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
-------------------------- |
-------------------------- |
| 24/11/05 |
Total |
110
E |
15
E |
|